Past Performance:

Client: US Navy Location: NASWF Outlying Landing Field, Choctaw, FL This design-bid-build SRM project for CESAM required Sweat, LLC to install a pavement protection system at two arresting gear locations at NASWF Choctaw Field. Safety: This project was completed with zero recordables in accordance with the approved safety plan. Cost: $1,098,354.00

Client: NAVFAC SE Location: NAS Jacksonville, FL This Design-Bid-Build new construction project involved the construction of a new boat maintenance facility. Safety: This project was successfully completed with zero recordables, in accordance with the approved site safety plan. Cost: $1,509,469.59

Client: U.S. Navy Location: NAS Pensacola, FL Naval Hospital Pensacola had been suffering from leak issues for years, by some reports since it had been constructed. SWEAT was awarded this Design Build SRM project to conduct a leak investigation and develop a design that would remediate these issues. The work was completed on an 8-story building. Safety: This project was completed with zero recordables and in accordance with the approved safety plan. Cost: $1,022,987.00

Client: US Navy Location: NASWF Outlying Landing Field, Choctaw, FL This design-bid-build SRM project for CESAM required Sweat, LLC to install a pavement protection system at two arresting gear locations at NASWF Choctaw Field. Safety: This project was completed with zero recordables in accordance with the approved safety plan. Cost: $1,098,354.00
More detailed information about these jobs is available upon request.